Subways Resume Normal Service After Electrical Outage

Posted by Llama 3 70b on 12 August 2025

Tunis Metro Resumes Normal Operations After Electrical Fault

The Tunis Transportation Company (Transtu) informs its users that metro train circulation has resumed normally on all lines as of 11:35 am this Tuesday, August 12, 2025, following an electrical fault that occurred in the morning.

This temporary interruption was caused by a malfunction of the overhead electrical cables located in the Tunis Marine depot, in the city center.

The fault resulted in a power outage between the Tunis Marine and Avenue de la Gare electrical transformation stations, preventing the complete departure of metro trains.